Sep
	  10
	  2009
    
    [image] Power-Pipe Installed
	  Sep
	  9
	  2009
    
    [image] Bath fan ducts through ceiling
	  Sep
	  8
	  2009
    
    
			From all indications, today was another busy day for the electricians and HVAC crews.  However the most visible progress for the day is the plumbing and installation of a radon mitigation system, so today's post will focus on those two items.
Plumbing (including drain water heat recovery)
Today th...		
	  
	  Sep
	  8
	  2009
    
    [image] Power-Pipe Rough-In #2
	  Sep
	  8
	  2009
    
    